Client

SJRI


Architect

Architectural Environments


Location

Nashville, TN


Completion

2014


Construction Cost

$0-5 million

Southern Joint Replacement Institute is a unique surgeon-owned practice that provides state-of-the-art orthopaedic care. SJRI’s practice was relocated to Centennial’s Medical Center campus, and their biggest priority was to make sure the practice was reopened quickly and according to plans. The quick turnaround and modifying the existing HVAC to work in SJRI’s new space were challenging, but The Parent Company’s thoroughness and attention to detail resulted in a project that was completed correctly and on time.

The Parent Company also worked with the Architect to construct interesting design elements throughout the space. The entry to the space is constructed of back-lit hanging millwork panels which resemble shattered glass.

  • Quick Turnaround SJRI’s practice needed to be back in operation as soon as possible which meant an accelerated schedule. The Parent Company’s attention to detail allowed the project to be completed quickly and smoothly and had the surgeons back at work in no time.
  • Office space
  • Exam rooms
  • General Contracting Services
  • Pre-Construction

Project Team

Bob Sarratt

Principal

Cole Bourland

Project Manager

Todd Mangrum

Superintendent